{"id":1864,"date":"2023-03-26T07:28:58","date_gmt":"2023-03-26T07:28:58","guid":{"rendered":"https:\/\/ni4h.org\/?p=1864"},"modified":"2023-06-20T08:12:12","modified_gmt":"2023-06-20T08:12:12","slug":"controversial-horsham-exhibition-for-residents","status":"publish","type":"post","link":"https:\/\/ni4h.org\/index.php\/2023\/03\/26\/controversial-horsham-exhibition-for-residents\/","title":{"rendered":"Controversial Horsham Exhibition for Residents"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Press Release <\/h2>\n\n\n\n<p><\/p>\n\n\n\n<p>After many years of campaigning against the proposed controversial\nHorsham incinerator, by the No Incinerator 4 Horsham (Ni4H) Community Group, it\nnow looks as though the project is going ahead. Construction work on the massive\nbuilding and 95-metre stack is set to start in Summer 2023 and take more than\nthree years to complete. The proposed incinerator would be located in North\nHorsham, off the A264, near Warnham Station, the under-construction Mowbray\nVillage. When complete, the site would receive 230,000 tonnes per annum of\nwaste, of which 180,000 tonnes per annum is expected to be incinerated, 24\nhours a day, 7 days a week.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Public Exhibition<\/h2>\n\n\n\n<p><\/p>\n\n\n\n<p>A drop in Public Exhibition is being held on Saturday 22nd April 2023 from 10.30am to 3.30pm at Tanbridge House School, Farthings Hill, Guildford Road, Horsham RH12 1SR. Members of the public will have a chance to quiz Qair, the new owners, and Hitachi Zosen Inova, constructors and operators, along with the Environment Agency, about the Horsham incinerator project. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Community Liaison Group<\/h2>\n\n\n\n<p><\/p>\n\n\n\n<p>Members of the public are also being encouraged to volunteer to join the Community Liaison Group, to discuss project progress, and the impact on the local community. Horsham residents who are members of the group have sent Qair more than 50 questions, covering ongoing concerns about the project and responses are awaited. <\/p>\n\n\n\n<p>For Qair Group, a French\ncompany, this will be their first incinerator development, having bought the\noriginal developers, Britaniacrest Recycling Ltd, in 2022. Hitachi\nZosen Inova are currently involved in the construction and operation of more\nthan a dozen UK-based incinerators. <\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p> \u201cNi4H would rather the Horsham incinerator isn\u2019t built. It will impact on the lives of Horsham residents for the 3 and a half years construction and commissioning phases, and for an expected 30 years of operation, changing the landscape of Horsham for a generation. Additionally, despite being called \u2018energy from waste\u2019, the proposed incinerator is not in the right location to use the heat it generates. The public exhibition provides the first opportunity for more than 5 years, for the public to engage directly with the owners and operators of the proposed incinerator about this life-changing project \u2013 we encourage members of the public to attend.\u201d <\/p><cite>An Ni4H spokesperson<br><br><\/cite><\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\"><\/h2>\n\n\n\n<h2 class=\"wp-block-heading\">Incineration Tax<\/h2>\n\n\n\n<p><\/p>\n\n\n\n<p>Meanwhile, key Conservative MPs, whose constituencies are impacted by incinerators, are being encouraged to demand the fiscal disincentivising of so-called Energy from Waste plants, by calling for Incineration Tax legislation similar to the current Landfill Tax. An Incineration Tax would encourage more sustainable alternatives of waste management that can help prevent emissions of greenhouse gases and reduce pollutants.<\/p>\n\n\n\n<p>Website: <a href=\"http:\/\/ni4h.org\">http:\/\/ni4h.org<\/a> <\/p>\n\n\n\n<p>Email: <a href=\"file:\/\/UXENSVR\/%7bFD34A37F%7d\/EXT\/1R\/NoIncinerator4Horsham@gmail.com\">NoIncinerator4Horsham@gmail.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Press Release After many years of campaigning against the proposed controversial Horsham incinerator, by the No Incinerator 4 Horsham (Ni4H) Community Group, it now looks as though the project is going ahead. Construction work on the massive building and 95-metre stack is set to start in Summer 2023 and take more than three years to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1179,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-1864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/posts\/1864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/comments?post=1864"}],"version-history":[{"count":12,"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/posts\/1864\/revisions"}],"predecessor-version":[{"id":2020,"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/posts\/1864\/revisions\/2020"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/media\/1179"}],"wp:attachment":[{"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/media?parent=1864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/categories?post=1864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ni4h.org\/index.php\/wp-json\/wp\/v2\/tags?post=1864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}